最新2021厕所偷拍精品视频,337久久网亚洲,国产剧情国产精品一区,国产免费一级视频,久久久精品视频免费,日本亚洲成本人片

中文版     ENGLISH 
News
Contact UsMore>>
Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
Tel:86-0755-26788241
Fax:86-0755-26788245
Industry NewsNews > Industry News > What should be paid attention to in the PCBA potting process?    

What should be paid attention to in the PCBA potting process?

Hits:1  Add Date:2020/9/11

1. Choose a suitable glue: commonly usedsilicone and epoxy potting glue, at least understand the "operating windowtime" and "curing time" parameters.

2. The temperature of PCBA before the gluecan be approximately the same as the temperature of the glue.

3. The PCB that needs to be sealed must beheated in a drying tunnel and baked to 50°C.

4. Too much flux residue needs to becleaned up to keep the PCBA surface clean.

5. It is best to inject glue into thepotting box first, and then put the PCBA into it.

6. The ratio of polyurethane potting gluemust be accurate. The two commonly used methods are 100:50 and 100:74, whichare all formulated according to the properties of the glue.

It is easy to produce air bubbles whenfilling the glue, which is a problem that needs to be paid attention to whenconducting PCBA glue filling.

PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
崇礼县| 无极县| 临漳县| 应用必备| 兴仁县| 临武县| 抚顺县| 大冶市| 元阳县| 揭东县| 得荣县| 瑞安市| 平武县| 长汀县| 双辽市| 兰州市| 赤壁市| 通道| 历史| 博兴县| 天津市| 百色市| 通河县| 呈贡县| 拜泉县| 南康市| 遵义市| 秦皇岛市| 太康县| 丰台区| 弋阳县| 稻城县| 尼勒克县| 珠海市| 白玉县| 麻城市|